New detached ADU in San Mateo with modern exterior

San Mateo has consistently been one of the most ADU-friendly cities in San Mateo County, with streamlined permitting and a Building Division that processes ADUs efficiently. If you've been thinking about adding an ADU to your San Mateo property, here's what to expect cost-wise in 2026.

Detached new-construction ADU

Range: $350,000 – $960,000 for 500–1,200 sq ft

Per-square-foot, San Mateo detached ADUs are running $700–$800 per sq ft in 2026 for a fully-finished build, depending on finish level and site conditions. That includes:

  • Engineered foundation
  • Full framing, sheathing, exterior cladding
  • Insulation and Title 24 compliance
  • Roof, windows, doors
  • Full electrical, plumbing, and HVAC (typically mini-split heat pumps)
  • Kitchen and bathroom build-out
  • Flooring and interior finishes
  • Permit handling and inspections

Attached ADU (addition that operates as separate unit)

Range: $280,000 – $500,000

Attached ADUs share a wall with the main house and often share a utility connection point, which can save $15,000–$40,000 over a detached unit. Trade-off: more complex structural tie-ins and sometimes more permit scrutiny.

Garage conversion ADU

Range: $140,000 – $280,000

Converting an existing attached or detached garage is the lowest-cost path to an ADU in San Mateo. You're reusing the foundation, framing, and roof. Costs go to:

  • Slab evaluation and insulation
  • Wall insulation and drywall
  • Window installation (egress required)
  • Electrical sub-feed and plumbing rough-in
  • Kitchen and bathroom build-out
  • Mini-split HVAC
  • Permit handling

Caveat: older garages with shallow foundations sometimes require foundation work, which can add $20,000–$40,000.

Junior ADU (JADU)

Range: $80,000 – $160,000

A JADU is a smaller unit (max 500 sq ft) carved out of the existing home — typically a bedroom suite with an efficiency kitchen and its own entrance. Cheapest path to a rentable unit but requires owner-occupancy of either the main house or the JADU.

San Mateo permit and impact fees

For a typical detached ADU in 2026, expect:

  • Building permit: $4,000–$7,000
  • Plan check: $2,000–$3,500
  • School impact fee (for ADUs over 750 sq ft): ~$5,000
  • SMAWPP utility connection fees (varies)

San Mateo waives many impact fees for ADUs under 750 sq ft, which is one reason 750 sq ft is a common target.

Timeline expectations

  • Design + permits: 3–5 months
  • Construction (detached): 5–7 months
  • Construction (garage conversion): 3–4 months

See a recent detached ADU build we completed in San Mateo for what the finished product looks like, or learn more about our San Mateo ADU construction.

Planning a Bay Area remodel?

High Touch Consulting & Development is a licensed general contractor serving the San Francisco Peninsula and Silicon Valley. We provide free on-site consultations and fixed-scope written proposals.

Ready to start your remodel?

Get a no-cost on-site consultation and a fixed-scope written proposal from a licensed Bay Area general contractor.